If you're searching for how to start selling Method Statements as a digital product online, the short answer is: it's one of the most accessible digital products to create and sell, and it fits neatly into CraftedDocs' Word Document category. This guide walks through what method statements actually are as a sellable product, how to create them, how to price them, and the exact steps to publish your first listing.
What Are Method Statements?
Method Statements are a type of digital document that buyers download and use directly or customise for their own needs. As a digital product, there's no physical printing or shipping involved — buyers pay once and get instant access to the file.
Why Sell Method Statements Online
- Buyers consistently search for ready-made method statements instead of building their own from scratch, which saves them hours of work.
- Once created, a single method statements file can be sold to hundreds of buyers without any extra effort on your part.
- There's no inventory or shipping involved — you create the file once and it's available to sell immediately and indefinitely.
How to Create Method Statements to Sell
- Decide on the exact scope of your method statements — what's included, and who it's for.
- Build it using one of these common tools:
- Microsoft Word
- Google Docs
- Keep formatting, fonts, and colours consistent throughout for a professional finish.
- Fill it with realistic sample content so buyers can see exactly how it looks in use.
- Export in the format CraftedDocs accepts for this category: .docx .doc .pdf .odt · max 50MB.
How to Price Your Method Statements
| Positioning | Typical Price (₹) |
|---|---|
| Simple / single-item version | ₹49 |
| Standard, well-designed version | ₹274 |
| Premium / full bundle version | ₹499 |
Check a few similar listings already selling on CraftedDocs before finalising your price, and remember you keep 80% of whatever you charge.
Include a filled-in sample version alongside the blank template so buyers can see exactly what a completed version looks like.
Step-by-Step: Listing Method Statements on CraftedDocs
- Go to crafteddocs.com/sell and select the Word Document category.
- Write a clear, specific title — name the exact type of method statements and what's included.
- Set your price in ₹ (minimum ₹9) and an optional sale price if you want to run an introductory offer.
- Write your description — what's included, who it's for, and what makes your version worth buying.
- Add comma-separated tags buyers would actually search for.
- Upload your file (.docx .doc .pdf .odt · max 50MB), plus an optional free preview file.
- Add a cover image (required) and up to 6 gallery images (optional).
- Confirm the originality checkbox and click List for sale — your listing is reviewed within 24 hours.
Frequently Asked Questions
Do I need professional skills to create method statements?
No — clarity, organisation, and consistent formatting matter far more than advanced design skills for most buyers.
How much can I earn selling method statements online?
It depends on your pricing, promotion, and catalogue size, but a well-made listing can keep generating sales for a long time with very little ongoing effort.
What file format should I use for method statements?
On CraftedDocs' Word Document category, the accepted formats are .docx .doc .pdf .odt · max 50MB — export your final file accordingly.
Can I sell method statements on more than one platform?
Yes, as long as the platforms you use don't require exclusivity — most, including CraftedDocs, don't.
Ready to turn this into income? Create a free seller account on CraftedDocs and publish your first listing — it takes less than ten minutes.